CONSTRUCTION OF THE TERHENTI DUG BRIDGE

  • 16th July 2018
Farming is active with the background of the bridge that has not finished the development process, in the Mekar Beach area, Muara Gembong, Bekasi District, West Java, Monday (16/7). The construction of Bekasi’s connecting bridge and Karawang that transversely above the Citarum River was stopped due to the fee. ANTARA PHOTO/Risky Andrianto/aww/18.
Related photo
Standard
Image information
Image size
4000x2574
File size
2.8 MB
Created
16/07/2018 20:00 WIB
Photographer
Risky Andrianto
Editor