SEDIMENTATION DREDGING
MAKASSAR, 18/10 - REQUIREMENTATION. A heavy equipment dredging sedimentation to initiate the power of the water power plant reservoir (PLTA) Fuel, Pinrang Regency, Sulsel, Saturday (17/10). The distribution of water that heads to the coal of the Fuel Plant has a drastic reduction in this dry season. The capacity of 126 MW Fuel Power Plant, 30 MW dryness during day and 100 MW at night. ANTARA PHOTO/Sahrul Manda Tikupadang/yu/pd/09
Related photo