SEVERE BROKEN HANGING BRIDGE

  • 4th August 2018 GMT+7
The rider crosses the broken hanging bridge in the village of Lhok Guci, Pante Ceureumen, West Aceh, Aceh, Saturday (4/8). The interstate liaison alternative hanging bridge that was built in mid 2008 has tilted due to water-coated bridge anchoring concrete as well as damage to the wall and bridge floor. ANTARA PHOTO/Syifa Yulinnas/foc/18.
Related photo
Standard
Image information
Image size
4000x2667
File size
2.45 MB
Created
04/08/2018 21:30 WIB
Photographer
Syifa Yulinnas
Editor