NORMALIZING DOWNSTREAM RIVER PEPE SOLO

  • 8th September 2018
Workers use heavy equipment complete the River Normalizing Project of Pepe in Gandekan, Solo, Central Java, Saturday (8/9). A total of 30 family heads are located due to the affected normalization of the Pepe River downstream to reduce the risk of over 80 hectares of flooding in three districts in Solo City. ANTARA PHOTO/Mohammad Ayudha/ama/18.
Related photo
Standard
Image information
Image size
4000x2667
File size
2.65 MB
Created
08/09/2018 17:45 WIB
Photographer
Mohammad Ayudha
Editor