TRIAL CONTRAFLOW DEAS TOL JORR
The rider for the implementation of the contraflow traffic engineering (direct direction) carried out in Jakarta Outer Ring Road (JORR) Cikunir direction Pondok Indah km 47, in Bekasi, West Java, Thursday (20/9). PT Jalan Tol Lingkar Outer (JLJ) imposes a traffic engineering trial of the opposite line (Contra flow) in the Kel JORR segment Kalimalang-Cikunir direction Pondok Indah, from 19 September 2018 to 3 October 2018 at 08.00-10.00 WIB, to decompose congestion. ANTARA PHOTO/Risky Andrianto/aww/18.
Related photo