POWER PLANT WASTE POWER
Rent a waste at the End Disposal Place (TPA) Benowo, Surabaya, East Java, Monday (1/10). TPA Benowo managed by PT Organic Sources to the Garbage Power Plant (PLTSa) currently produces 2 megawatts and is planned to add electricity production to 11 megawatts in 2019. ANTARA PHOTO/Zabur Karu/nz/18
Related photo