NELAYAN WAITING SOLAR SUPPLY

  • 10th November 2018 GMT+7
Nelayan waiting for solar supply in SPBN Port Lamplo, Banda Aceh, Aceh, Saturday (10/11/2018). A number of local fishers represents the difficulty of obtaining solar fuels because the solar supply quota in SPBN is limited to 8,000 tons per day. Local SPBN parties are forced to impose a system of 10 to 15 pilgrims per boat. ANTARA PHOTO/Ampelsa/kye.
Related photo
Standard
Image information
Image size
4000x2667
File size
4.54 MB
Created
10/11/2018 16:10 WIB
Photographer
Ampelsa
Editor
Ismar Patrizki