SPAM MONTHS

  • 15th November 2018 GMT+7
The officer checked the pool shelter Drinking Water Supply System (SPAM) Umbulan Pasuruan, East Java, Thursday (15/11/2018). The Umbulan SPAM Project conducted by META is a consortium between Medco International Energy and Bangun Tjipta Sarana through his subsidiary Builds a Contractor that has a 4,000 liter water discharge capacity per second with a transmission pipeline network along 93 km and is targeted to operate in mid-2019. ANTARA PHOTO/Zabur Karu/hp.
Related photo
Standard
Image information
Image size
4000x2667
File size
1.32 MB
Created
15/11/2018 18:45 WIB
Photographer
Zabur Karuru
Editor
Hermanus Prihatna