DREDGING SEDIMENTATION MUARA BEACH BOOM
Heavy equipment performs dredging at the muara Beach Boom, Banyuwangi East Java, Sunday (25/11/2018). Dredging the sedimentation of the muara, is carried out to facilitate the pathlined by fishermen during the sea water is massage. ANTARA PHOTO/Budi Candra Setya/aww.
Related photo