TRIAL TERMINAL PACKING BOX
PT Pelindo I checked the process of loading typing on the trial of the premier operation of Kuala Tanjung Multipurpose Terminal (KTMT) in Batu Bara, North Sumatra, Tuesday (27/11/2018). The development of the stage I Port Kuala Tanjung is the construction of a 600 thousand TEUs multipurpose terminal has entered the final preparation and has obtained the operation permit of the Multipurpose Dermaga from the Marine Transportation Director and the Head of Complaints and Port Authority (KSOP) Kuala Tanjung. ANTARA PHOTO/Irsan Mulyadi/hp.
Related photo