CONTRACT FOR THE RESULTS OF THE REGION OF THE WK SOUTH HOURBI B
Deputy Minister of ESDM Arcandra Tahar (second left), Secretary ESDM Ego Syahrial (left), Director Migas Djoko Studentnto (left three) and President Director Jindi South Jambi B Co. Ltd. Lu Yau Ming (second right) witnessed the signing of Contract documents for Gross Split Work Area Migas South Jambi "B" conducted by Head SKK Migas Dwi Soetjipto (right) in Jakarta, Thursday (20/12/2018). In the contract, the investment value of the Contract Work is sure (KKP) reaches USD 60 million with the Signature Bonus of USD 5 million. ANTARA PHOTO/Muhammad Adimaja/foc.
Related photo