CONTRACT FOR THE RESULTS OF THE REGION OF THE WK SOUTH HOURBI B
Head SKK Migas Dwi Soetjipto (right) provides Contract Documents for Gross Split Work Areas Migas South Jambi "B" to President Director Jindi South Jambi B Co. Ltd. Lu Yau Ming (second right) witnessed by Deputy Minister of ESDM Arcandra Tahar (left three), Secretary ESDM Ego Syahrial (second left) and Director Migas Djoko Studentnto (left) signed the document in Jakarta, Thursday (20/12/2018). In the contract, the investment value of the Contract Work is sure (KKP) reaches USD 60 million with the Signature Bonus of USD 5 million. ANTARA PHOTO/Muhammad Adimaja/foc.
Related photo