SUTET TRANSMISSION MATERIAL REPLACEMENT

  • 13th January 2019 GMT+7
Workers do the replacement of the main transmission material of the Extra High Voltage Air Line (SUTET) that crosses in Serpong, South Tangerang, Banten, Sunday (13/1/2019). To strengthen the Jakarta and Banten electrical system, PLN makes the replacement of major transmission materials such as Sutet 500 kV Conductor, Capasitor Voltage Transformer (CVT) the Balaraja-Lengkong-Gandul line with total investment of Rp500 billion. ANTARA PHOTO/Muhammad Iqbal/wsj.
Related photo
Standard
Image information
Image size
4000x2533
File size
1.8 MB
Created
13/01/2019 17:30 WIB
Photographer
Muhammad Iqbal
Editor
Widodo S Jusuf