IV SIAK BRIDGE LOAD TEST

  • 8th February 2019 GMT+7
The Ministry of Public Works along the team of Bridge Security Commissions and Road Tunnels (KKJTJ) conducts a load test or load test by compiling 24 units of sand-filled truck car in the Siak Bridge IV Pekanbaru, Riau, Friday (8/2/2019). This load test is carried out to prove that the security level of the structure parts has met the requirements of existing building regulations before the bridge was officially operated. ANTARA PHOTO/Rony Muharrman/pd.
Related photo
Standard
Image information
Image size
4000x2667
File size
1.94 MB
Created
08/02/2019 21:30 WIB
Photographer
Rony Muharrman
Editor
Pandu Dewantara