REPAIR TISSUE LAA POST ACCIDENTAL CRL

  • 11th March 2019 GMT+7
Workers repair the Top Flow Electric Network (LAA) post accidental KRL in Kebon Pedes, Bogor, West Java, Monday (11/3/2019). PT KCI strives for the repair of LAA as well as the replacement of the pole on the railroad, so that the train schedule is returned to normal. ANTARA PHOTO/Yulius Satria Wijaya/aww.
Related photo
Standard
Image information
Image size
4000x2672
File size
1.22 MB
Created
11/03/2019 10:50 WIB
Photographer
Yulius Satria Wijaya
Editor
Andika Wahyu