POWER INDONESIA

  • 14th March 2019
Director of Engineering PT Tanjung Power Indonesia Kim Sangjong (left) with Commissioner PT Tanjung Power Indonesia Mustiko Bawono (mid) and Director of PT Adaro Power Adrian Lembong (right) discussed the development of PLTU Tanjung Power Indonesia in Tanjung, Tabalong, South Kalimantan, Wednesday (13/3/2019). The 2x100 MW capacity is built by PT Tanjung Power Indonesia consortium PT Adaro Power (65 percent) and PT East West Power (35 percent) using CBF technology so it can reduce NOx emissions and targeted from operating in semester 1 year 2019. ANTARA PHOTO/Hafidz Mubarak A/pras,
Related photo
Standard
Image information
Image size
5255x3503
File size
1.7 MB
Created
14/03/2019 00:35 WIB
Photographer
Hafidz Mubarak A
Editor