OPERATION OF THE IV WEEKBARU BRIDGE

  • 18th March 2019 GMT+7
A number of people crossed in the Siak IV Bridge on the first day the operation of the bridge in Pekanbaru City, Riau, Monday (18/3/2019). This 800-metre-long Siak Bridge is finally completed and can be used by the public, after 10 years of its rising process was stopped at a total cost of Rp483,68 billion. ANTARA PHOTO/FB Anggoro/foc.
Related photo
Standard
Image information
Image size
4000x2667
File size
2.17 MB
Created
18/03/2019 14:05 WIB
Photographer
Fb Anggoro
Editor
Fanny Octavianus