POWER 200 MV
BANGKALAN, 26/1 - ELECTRIC 200 MV. A number of workers install work supporting tools, to install electrical wiring on the two-wheel path of Surabaya, Tuesday (26/1). The electrical cable to add electricity supply to the Madura Island of 200 MV. As a result of the workmanship, the motor driver is switched to the four wheel path. PHOTO ANTARA/Eric Ireng/ss/mes/10
Related photo