CONTINUATION OF THE DEVELOPMENT OF WOODTANAM BRIDGE
The vehicle turns through the Kalu Stem emergency bridge, on the Padang Line - Bukittinggi, Kayutanam, Kab.Padangpariaman, West Sumatra, Thursday (11/4/2019). The re-development of a bridge by the Ministry of PUPR at the cost of Rp15 billion continued with the manufacture of foundations, and for a while the vehicle can be changed through two pre-built emergency bridges. ANTARA PHOTO/Iggoy el Fitra/aww.
Related photo