MAIN CIKARANG TOLL GATE RELOCATION PLAN

  • 25th April 2019 GMT+7
The rider slows down the vehicle rate when entering the Main Cikarang Toll Gate 1 in Cikarang, Bekasi District, West Java, Thursday (25/4/2019). Head of Operation and Maintenance of the Tol Road Regulatory Agency (BPTJ) said to do the disassembling and relocation of the Tol Gate (GT) Main Cikarang to GT Cikampek Utama and Dawuan and targeted operations on the 2019 wide mudik current. ANTARA PHOTO/Risky Andrianto/pras.
Related photo
Standard
Image information
Image size
4000x2667
File size
2.33 MB
Created
25/04/2019 21:40 WIB
Photographer
Risky Andrianto
Editor
Prasetyo Utomo