EMERGENCY ROAD REPAIR
A truck planted a river water-moving emergency road body in Omu Village, Gumbasa District, Sigi, Central Sulawesi, Sunday (19/5/2019). The disconnected road due to the early beam flood of May 2019, then it was emergencyally fixed to be accessed by citizens to abide by wider mudic flow. ANTARA PHOTO/Basri Marzuki/foc.
Related photo