ADDED POWER GENERATION
JAKARTA, 6/4 - EXHIBITION OF MERCHANTA. President Director of PT Truba Jaya Engineering (PT TJE), Erman Suparno (the left) reviewed the Gas and Steam Power Plant project (PLTGU) Muara Karang, North Jakarta, Tuesday (6/4). PLN with PT Truba Jaya Engineering built a 10000 watt project divided by 6900 watts for the Java-Bali interconnection area as well as 3100 watts for outside Java to overcome electrical crisis. The PLTGU has used high technology and reduces the use of fuel in the form of solar with the utilization of coal alternative energy. ANTARA/Yudhi Mahatma/pd/10
Related photo