GASIB PLATMG INAUGURATION 25 MW

  • 31st July 2019 GMT+7
The officer checked the Gas Engine Power Plant (PLTMG) 25 Megawatt Koto Gasib inaugurated its operation in Siak Regency, Riau, Wednesday (31/7/2019). To support the ‘Sumatera Terang Flagng’ program PT PLN Riau Kepri operates a 25 Megawatt Koto Gasib-capacity PLTMG, Gardu Induk (GI) New Garuda Sakti 60 MVA and High Voltage Air Line (SUTT) Dumai. ANTARA PHOTO/Rony Muharrman/wsj.
Related photo
Standard
Image information
Image size
4000x2667
File size
1.57 MB
Created
31/07/2019 20:20 WIB
Photographer
Rony Muharrman
Editor
Widodo S Jusuf