DAM ARGOGURUH WAY LIVE RESPONSIBILITY
TANJUNG KARANG, 18/3 - Dam Argoguruh Way Sekampung in Tagineneng, South Lampung was built Th. 1935 Dutch colonial times. Tuesday(18/3/1980) Water discharge used today 37 M3/det and max 44 M3/det words KDPUP Prop. Lampung Ir. Sigit Raharjo. When reviewed Minister PU Ir. Punomosidi Hajisarosa Tg. March 6, 1980 water discharge 92 M3/det so that 55 M3/det was seen in the image. The circulation of the water is 65,000 Ha, now the new effective is more 35,000 Ha. If the dry season of the water is far shrinking, for the Induk channel is not enough, the Way Sekampung length is 256 Km, with a Rae 4.795,52 Km2. ANTARA PHOTO/AMZ/s/hp/dw
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.