REQUIREMENTS OF THE NEGARA LIFESTYLE OF HIGH-BUTION
PADANG. 3-11-1980. The bridge replacement on the state road between Padang-Bukit high (91 Km) is now practically completed, unless the Anai Bridge located exactly in front of the Anai waterfall. The bridge is small and short, but the difficulties faced are because the bridge is overlaped with the railway bridge. ANTARA PHOTO/dw.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.