REPAIR RAIL CA
SIDOARJO, 8/1 - REL KA SUPPORT. Railway rails in Porong, Sidoarjo, East Java (8/1) which is still soaked mud Lapindo Brantas repaired with the addition of rocks. The four-day KA line is closed Monday to install (7/1) because the mud height reaches 40 cm is opened and passed the railway. ANTARA/Hadiyanto/ss/mes/08
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.