THE PANTURA BRIDGE IS BROKEN BACK
A number of workers complete the perforated multiplier bridge welding on the pantura line, Brebes, Jateng, Monday (29/7). At H-10 the boiler bridge located on the pantura line is broken back, so it makes the jam and harm the flow of the mudr that crosses. ANTARA PHOTO/Oky Lukmansyah/ss/mes/13
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.