Actualizar el potencial energético en NTB
Solar Power Plant (PLTS) on grid Capacidad prolongada 7 MWp operado Vena Energy en Geres Village, Distrito de Labuhan Haji, Selong, East Lombok, NTB, Lunes (15/7/2024). Energy and Mineral Resources Department (ESDM) NTB Province mentions the renewable energy potential in NTB currently reached13.563 Megawat (MW) consisting of bioenergy 298 MW, 32 MW city waste, wind 2.605 MW and solar power 10.628 MW. ANTARA PHOTO/Ahmad Subaidi/foc.
Foto relacionada