DESMANTELAMIENTO
SIDOARJO, 6/5 - BONGKAR TOL. Una herramienta pesada desmantra el acceso a la carretera Toll Porong, Sidoarjo, miércoles (6/5). Access tol majors of Surabaya-Porong that is not operated by post submerged mud due to the exploding of Pertamina gas pipes in October 2006, it will be located through 11 villages in Sidoarjo Regency and four villages in Pusuruan Regency along 10 Km, with a fund budget of Rp 1.5 trillion. PHOTO ANTARA/Eric Ireng/ED/ama/09
Foto relacionada