AMPLIACIÓN DE LA CARRETERA A LINFATU
Una unidad de excavadora se opera para trabajar el proyecto de hemorragia vial en la zona turística del lago Kelimutu, Ende, NTT, martes (8/8). The National Road Execution Hall (BPJN) the X Kupang area widen the roadside towards the natural Kelimutu Lake tourism area 4.5 meters to seven meters in order to smooth access to Kelimutu Lake. ANTARA PHOTO/Kornelis Kaha/kye/17.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.