ASDP Ternate engineering interpualu trasportation schedule in Ternate

  • 12th May 2023 WIB
ASDP Ternate engineering interpualu trasportation schedule in Ternate
La condición del muelle de conexión del vehículo es ambruk en Dermaga 1 Port Ferry Bastiong, Ternate City, North Maluku, viernes (12/5/2023). PT ASDP Indonesia Ferries Ternate Branch impone interpulse crossroad transportation schedule engineering using ferry vessels while the time due to its ambruk is one of the piers assembled by KMP Mutiara Pertiwi 1 on May 10, 2023, when it will lean for loading and unloading activities. The result of the incident of the 1BAR ASDP Branch Ternate pier suffers from the fear of reaching Rp25 billion. ANTARA PHOTO/Andri Saputra/foc.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Foto relacionada
Tags:
Información de la imagen
Tamaño de la imagen
5000x3438
Tamaño del archivo
1.05 MB
Creada
12/05/2023 15:20 WIB
Fotógrafo
Andri Saputra
Editor
Fanny Octavianus