Cirata Floating PLTS opera

  • 9th November 2023 GMT+7
Cirata Floating PLTS opera
El oficial monitorea el área de planta de la sala de control de generación de energía solar (PLTS) Cirata flotante en Purwakarta Regency, Java occidental, jueves (9/11/2023). Cirata Floating PLTS with 192 Megawatt Peak capacity which is the largest flotaing PLTS in Southeast Asia and the third largest in the world began to be operated to meet the needs of listings in Java Island, Madura and Bali. ANTARA PHOTO/Raisan Al Farisi/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Foto relacionada
Tags:
Información de la imagen
Tamaño de la imagen
4928x3280
Tamaño del archivo
2.99 MB
Creada
09/11/2023 12:20 WIB
Fotógrafo
Raisan Al Farisi
Editor
Puspa Perwitasari