Necesidades de infraestructura eléctrica nacional
El oficial lleva a cabo el mantenimiento de la línea aérea de alto voltaje (SUTET) en Serang City, Banten, jueves (21/11/2024). The Ministry of Energy and Mineral Resources (ESDM) revealed at least Rp 1,000 trillion to build electricity infrastructure in the form of transmission and power generation in the next 10 years as the increase in domestic electricity demand. ANTARA FOTO/Putra M. Akbar/gp/foc.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.