Cirata Floating PLTS opère

  • 9th November 2023 GMT+7
L'agent surveille la zone végétale de la salle de contrôle de la production d'énergie solaire (PLTS) Floating Cirata in Purwakarta Regency, West Java, jeudi (9/11/2023). Cirata Floating PLTS with 192 Megawatt Peak capacity which is the largest floating PLTS in Southeast Asia and the third largest in the world began to be operated to meet the needs of listings in Java Island, Madura and Bali. ANTARA PHOTO/Raisan Al Farisi/rwa.
Photo associée
Standard
Informations sur les images
Taille de l'image
4928x3280
Taille du fichier
2.99 MB
Créé
09/11/2023 12:20 WIB
Photographe
Raisan Al Farisi
Éditrice
Puspa Perwitasari