CANALISATION D'ESSAI DE LA LIGNE DE POINTE BOGOR
La police surveille les passés à travers l'écran de gestion de la circulation pendant le traitement du système de canalisation 2:1 à Gadog, Bogor, Java Ouest, dimanche (27/10/2019). Police and Jabodetabek Transportation Manager Agency (BPTJ) began to test the 2:1 channelization system on the Peak path, as a replacement of the system open the cap or one direction (one way), to decompose traffic flow jams due to the vehicle volume spike at weekends. ANTARA PHOTO/Yulius Satria Wijaya/ama.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.