THAMRIN INTERCONNECTE NEUF-UOB AVEC LA STATION SUPéRIEURE DE MRT

  • 7 Juli 2022 14:55 WIB
THAMRIN INTERCONNECTE NEUF-UOB AVEC LA STATION SUPéRIEURE DE MRT
The Governor of DKI Jakarta Anies Baswedan (left three) along the President Director of PT MRT Jakarta (Perseroda) William Sabandar (left), President Commissioner PT MRT Jakarta Muhammad Syaugi (second left), President Commissioner Thamrin Nine Complex Indra Djati Sidi (second right), President Director of PT Wisma Kartika Alvin Gozali (right three), Indonesia Le couloir d'interconnexion de 80 mètres qui relie Thamrin Nine à la gare MRT supérieure est le programme de développement axé sur le transit qui durera 18 mois avec un budget de 150 milliards de Rp. ANTARA PHOTO/Indrianto Eko Suwarso/rwa.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Photo associée
Tags:
Informations sur les images
Taille de l'image
4000x2667
Taille du fichier
6.19 MB
Créé
07/07/2022 14:55 WIB
Photographe
Indrianto Eko Suwarso
Éditrice
Puspa Perwitasari