FOREUSE DE ROUTE
BOGOR, 4/3 - JALAN TOL BORR. A heavy equipment dredging buildings in the RT 02/01 Cibuluh district, North Bogor District, Bogor, Jabar, Tuesday (4/3) for the construction of the Bogor Ring Road toll road (BORR) first stage. La construction de routes de péage de Bogor Ring Road le long de 11 Km a commencé South Sentul (Tol Jagorawi) jusqu'à Dramaga Bogor est un coût commun par PT Jasa Marga et PT Jasa Sarana, valeur Rp 1.577 trillion. ANTARA/Arif Firmansyah/ss/mes/08
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.