REMPLACEMENT DU TUYAU DE DÉRIVATION DE L'EAU DE BOUE
Les opérateurs d’équipements lourds d’exavator pour dredge Lapindo’s mud embankment in Porong, Sidoarjo, East Java, lundi (30/5). Sidoarjo mud management body (BPLS) dredge the embankment to replace the sludge water disposal pipe that leaks due to the crust or impurities carried by water. ANTARA PHOTO/Umarul Faruq/kye/16.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.