MOIS DE SPAM

  • 15th November 2018 WIB
MOIS DE SPAM
L'agent a vérifié l'abri de la piscine Système d'approvisionnement en eau potable (SPAM) Umbulan Pasuruan, Java Est, jeudi (15/11/2018). The Umbulan SPAM Project conducted by META is a consortium between Medco International Energy and Bangun Tjipta Sarana through his subsidiary Builds a Contractor that has a 4,000 liter water discharge capacity per second with a transmission pipeline network along 93 km and is targeted to operate in mid-2019. ANTARA PHOTO/Zabur Karu/hp.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Photo associée
Tags:
Informations sur les images
Taille de l'image
4000x2667
Taille du fichier
1.32 MB
Créé
15/11/2018 18:45 WIB
Photographe
Zabur Karuru
Éditrice
Hermanus Prihatna