MOIS DE SPAM
L'agent a vérifié la pompe principale Système d'approvisionnement en eau potable (SPAM) Umbulan Pasuruan, Java Est, jeudi (15/11/2018). The Umbulan SPAM Project conducted by META is a consortium between Medco International Energy and Bangun Tjipta Sarana through his subsidiary Builds a Contractor that has a 4,000 liter water discharge capacity per second with a transmission pipeline network along 93 km and is targeted to operate in mid-2019. ANTARA PHOTO/Zabur Karu/hp.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.