TRAIN D'EXPÉDITION BANGLADESH
The officer raised the delivery of the train to Bangladesh through Tanjungperak Port of Surabaya from PT Railway Industry (Inka) Madiun, East Java, Friday (19/4/2019). Le train de production de PT Inka fait partie de 250 trains de commande du Bangladesh avec une valeur contractuelle de Rp.1,4 trillion. ANTARA PHOTO/Siswowidodo/hp.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.