DOUBLE PATH LOAD TEST KA IN MADIUN

  • 24th September 2019 GMT+7
DOUBLE PATH LOAD TEST KA IN MADIUN
A series of load test trains (left) crosses a new path next to KA 155 Blitar-Marketing weapons on the double path of the Railway (KA) on Madiun, East Java, Tuesday (24/9/2019). KA double path load test is done to disguise each point on the double path before functioning. ANTARA PHOTO/Siswowidodo/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2680
File size
1.74 MB
Created
24/09/2019 13:25 WIB
Photographer
Siswowidodo
Editor
Andika Wahyu