DOUBLE PATH LOAD TEST KA
The officer conducts activity when the new rail path load test and Ôswich over' or a long path switch to a new path on the double line of the Railway (KA) between the Babadan Madiun KA Station Ngawi, East Java, Monday (14/10/2019). The 26 kilometers new rail path load test uses CC-203 9818 locomotives assembled with one Station Feeding Train to find out the path conditions in the framework of the preparation of the operation of the southern cross-cross KA double lines. ANTARA PHOTO/Siswowidodo/foc.
The caption is automatically translated by application. Click here for the Bahasa Indonesia version.