POSTO LAKE DREDGING PLAN

  • 2nd November 2019 GMT+7
POSTO LAKE DREDGING PLAN
A dredger (dredger) (right) is in the river of Poso Lake in Tentena, Poso Regency, Central Sulawesi, Saturday (2/11/2019). Despite getting about the majority of citizens, PT Poso Energy will still plan to drove the ancient lake to enlarge the discharge of water to rotate the turbines in order to increase the operation of the Sulewana III PLTA. ANTARA PHOTO/Basri Marzuki/wsj.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4000x2661
File size
2.33 MB
Created
02/11/2019 19:35 WIB
Photographer
Basri Marzuki
Editor
Widodo S Jusuf