ACCELERATE MAINTENANCE OF ELONGATED PLTU

  • 13th November 2019 WIB
ACCELERATE MAINTENANCE OF ELONGATED PLTU
A number of PLN officers perform periodic maintenance or "overhaul" Steam Power Plant (PLTU) Acne in Ayu Park Village, Gerung District, West Lombok, NTB, Wednesday (13/11/2019). PLN accelerates the maintenance of Steam Power Plant (PLTU) Acne Unit 2 and the targeted 3 Unit can operate from Friday (15/11/2019) where by re-operating the Acanjang Unit 2 and 3 PLTU will add power supply in the Lombok electrical system of 50 MW so that Lombok electricity returns normal with power is able to be around 273 MW with peak load of 259 MW.ANTARA PHOTO/Ahmad Subaidi/hp.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4048x2716
File size
3.08 MB
Created
13/11/2019 16:55 WIB
Photographer
Ahmad Subaidi
Editor
Hermanus Prihatna