OPERATION PLTMGU LOMBOK PEAKER

  • 18th November 2019 GMT+7
OPERATION PLTMGU LOMBOK PEAKER
Photo area of Gas and Steam Power Generation project (PLTMGU) Lombok Peaker in Tanjung Karang, Ampenan, Mataram, NTB, Monday (18/11/2019). PLN speeds up the operation periodically 3 units of plants from 13 units of each plant with a capacity of 10 MW in PLTMGU Lombok Peaker in order to reduce the occurrence of electric grinding in Lombok island. ANTARA PHOTO/Ahmad Subaidi/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4048x2705
File size
3.17 MB
Created
18/11/2019 19:00 WIB
Photographer
Ahmad Subaidi
Editor
Andika Wahyu