CIEUNTEUNG RETENTION POOL

  • 28th November 2019 GMT+7
CIEUNTEUNG RETENTION POOL
Cieunteung Retention Pool in Baleendah, Bandung Regency, West Java, Thursday (28/11/2019). The 87.7 ha retention pool is estimated to be able to accommodate 220 thousand m3 Citarum River exhaust water is expected to reduce the flooding area from the original 342 Ha to 41 Ha. ANTARA PHOTO/Found Al Farisi/ama.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2667
File size
2.06 MB
Created
28/11/2019 17:50 WIB
Photographer
Raisan Al Farisi
Editor
Audy Mirza Alwi