OLD PLATA IN CANNING

  • 29th November 2019 WIB
OLD PLATA IN CANNING
Operators conduct regular maintenance of water divider pipes in the Power Plant (PLTA) Lamajan, Pangalengan, Bandung Regency, West Java, Friday (29/11/2019). PLTA Lamajan built in 1925 was passed by three total capacity plants 19,56 MW which was able to evoke 1 MW by using 0.5 cubic meters of water discharge. ANTARA PHOTO/Novrian Arbi/pras.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
4000x2649
File size
2.3 MB
Created
29/11/2019 18:45 WIB
Photographer
Novrian Arbi
Editor
Prasetyo Utomo