CRACK BRIDGE DUE TO SOIL SHIFT

  • 3rd January 2020 GMT+7
CRACK BRIDGE DUE TO SOIL SHIFT
The rider slows down the rate of the vehicle when crossingI the Bekasi River iron bridge which is cracked, in the Agus Salim Road, Bekasi, West Java, Friday (3/1/2020). The condition of the cracked bridge due to the shift of soil in the river bank when the flood current. ANTARA PHOTO/Risky Andrianto/aww.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Tags:
Image information
Image size
4000x2728
File size
2.2 MB
Created
03/01/2020 19:40 WIB
Photographer
Risky Andrianto
Editor
Andika Wahyu