MALILI-LASUSUA LINE TRANSMISSION

  • 17th February 2020 GMT+7
MALILI-LASUSUA LINE TRANSMISSION
Workers cross near one of the 150 kV Malili Line Transmission towers (Southern Sulawesi)-Lasusua (South-east Hall) in Lasusua, North Kolaka Regency, Southeast Sulawesi, Monday (17/2/2020). PT Reka Elektrik have completed the transmission of the Malili-Lasusua line with a length of 32,37 kilometers and107 towers so that it can save the cost of production of PT PLN (persero) about Rp55 billion and is expected to help the distribution of electricity between South Sulawesi and Southeast Sulawesi. ANTARA PHOTO/Yusran Uccang/ama.

The caption is automatically translated by application. Click here for the Bahasa Indonesia version.

Related photo
Tags:
Image information
Image size
3000x1814
File size
1.41 MB
Created
17/02/2020 17:10 WIB
Photographer
Yusran Uccang
Editor
Audy Mirza Alwi